Skip to main content
 x 
Cart (
Empty
)

Cart

Your shopping cart is empty

Concrete Slabs - 1 Preparation

Now $37.50

The Concrete Slab Construction - Preparation Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with work carried out when preparing a site for construction of concrete slabs for residential premises, or commercial and industrial buildings including the installation of pipes and conduits, use of plant and equipment, risks of over-exertion and strain injury and the likelihood of exposure to hazardous chemicals.

The SWMS provides details of the health and safety precautions (including personal protective equipment requirements) to be observed when carrying out work associated with preparation for the construction of concrete slabs.